Interim Report as at 30 June 2026
A glass-walled box with sliding doors stands in the middle of a green space; inside, there is a table, a bench and two chairs, surrounded by plenty of plants.A glass-walled box with sliding doors stands in the middle of a green space; inside, there is a table, a bench and two chairs, surrounded by plenty of plants.

Downloads

This interim report is also available as a PDF. The content of this online interim report is identical to the PDF version.

Interim Report
as at 30 June 2026

The following PDF files are available for download

PDF

Bechtle AG – Interim Report as at 30 June 2026

 

45 pages

 

Download

Overview

 

2 pages

 

Download

Interim Group Management Report

 

17 pages

 

Download

Interim Statement

 

19 pages

 

Download

Further Information

 

4 pages

 

Download

The following Excel files are available for download

Excel

All tables of the Interim Report as at 30 June 2026 (indexed)

 

33 tables

 

Download

Overview

 

3 tables

 

Download

Interim Group Management Report

 

9 tables

 

Download

Interim Statement

 

23 tables

 

Download